Home renovation period preliminary estimate
2024-10-06 13:01:00
Estimated woodwork period
1. Estimated duration of the wooden curtain box The wooden curtain box production period, each worker can make two five-prolong meters around the curtain box per day.
2. Estimated duration of wooden wall skirtings. Wooden wall skirts should be equipped with wooden keels and panels. The installation of three-bedroom and two-bedroom rooms takes about 20 workers. Different wall skirts will affect the construction period. It usually takes 4 days.
3. Estimated construction period of wooden doors and windows The production of a new door requires two days of woodworking, one day of renovation, one day of installation, one half day of installation, and one half day of painting the finish.
4. Estimated duration of construction of the heating cover As for the seven heating covers in the three bedrooms and two living rooms, the woodworking production takes five days. The painter varies according to the type of paint used and the construction method, generally between three and eight days.
5. Estimated construction period of wood floor construction usually takes one week to complete the construction task of three rooms and two rooms, in which the installation of wooden keel and moisture treatment at the grassroots level for two days, the installation of the board and the floor for two days, the floor covering is planed to polish one day, the floor paint Brush for two days.
6. Estimated duration of the wooden grille ceiling The wooden grille ceiling is a relatively labor-intensive and complicated project. The wood grille ceiling is about 15 square meters. It takes about 10 days from the start of stock preparation to completion.
7. Project duration calculation of caisson ceilings Cascade ceilings are complex and technically demanding projects. The construction time is relatively long. Generally, it takes about 12 days. Woodworking takes 6 days, and electrical installation is 1 day. Brush, paste for 3 days, process waiting time 2 days
Estimated duration of the mason
1. Estimated Wall Tile Pasting Time Estimates Wall tile paste is a highly technical construction project. Each worker can complete about 5 square meters a day with good auxiliary materials and good primary treatment.
2. Estimated construction period of ground stone and porcelain brick paving The ground stone and porcelain tile paving are technically strong, and each worker paves about 6 square meters every day.
3. Estimated duration of cement mortar plastering On average, every person on the plastering roof can wipe 10 square meters, and the wall surface can wipe 14 square meters, but it requires 2 people to work together.
Estimated construction project duration
1. Estimated duration of the circuit reconstruction project The duration of the circuit reconstruction varies according to the structure. Each worker can manually slot about 20 meters per day. If it is a concrete structure, it can complete about 10 meters per person per day.
2. Estimated duration of the balcony If the balcony is closed, the time for installing the window frame and window sash is short, using steel or aluminum alloy windows, and two workers can complete the operation within one day. Convex seals have a long duration and usually take about 10 days.
3. Estimated duration of wooden keel partition wall A technical worker of wooden keel can finish about 7 square meters per day, and installing a partition wall takes about 2 days. The complexity of the wall varies and the duration will vary.
4. Estimated duration of the pipeline renovation project The reconstruction period of the pipeline shall be determined based on the complexity of the transformation and the condition of the structure. If the transformation is to be repeated across the wall and the hot and cold water is to be rebuilt and installed at the same time, the time is generally 3~ 4 days, if only in this room changes, generally 1 day time can be completed.
Paint period estimate
1. Estimated duration of mixed oil painting Mixed oil painting is a high-tech construction project. It takes a lot of man-hours. Generally, all three rooms, two halls, and all wooden furniture paintings need about 10 days, of which the grassroots treatment is about 2 days. Mixed oil brushing 3 times for 8 days, including process waiting time.
2. The estimated duration of oil painting is based on the three-bedroom, two-room home renovation example, including doors and windows, heating hoods, wooden wall skirts, and furniture making, etc., and veneering lacquer painting. The ordinary standard lacquer painting requires about 12 days. Varnish brushing takes about 14 days.
3. Estimated duration of latex paint application The technical complexity of latex paint application is low, and less man-hours are required. The top-level man-hours in construction are greater than the wall surface. Taking a three-bedroom, two-room roof and a wall surface emulsion paint as an example, it takes about six days, in which the grass-roots layer is treated for three days, the top coat is painted for two days, and the waiting time for the process is one day.
Other period estimates
1. The estimate of the wallpaper's construction period is better at the grass-roots level, with fewer wall attachments. Each person can be pasted about 20 square meters per day.
2. Estimated duration of carpet pavement If carpeting is a padded floor, two people can finish one room in a day when the grass is well treated.
3. Estimated duration of installation of kitchen equipment. A worker can work in coordination. It can install about 3 meters per day (usually the kitchen is installed with a kitchen extension of about 3 meters), including the installation of kitchen utensils, connection of water, electricity, and gas lines.
1. Estimated duration of the wooden curtain box The wooden curtain box production period, each worker can make two five-prolong meters around the curtain box per day.
2. Estimated duration of wooden wall skirtings. Wooden wall skirts should be equipped with wooden keels and panels. The installation of three-bedroom and two-bedroom rooms takes about 20 workers. Different wall skirts will affect the construction period. It usually takes 4 days.
3. Estimated construction period of wooden doors and windows The production of a new door requires two days of woodworking, one day of renovation, one day of installation, one half day of installation, and one half day of painting the finish.
4. Estimated duration of construction of the heating cover As for the seven heating covers in the three bedrooms and two living rooms, the woodworking production takes five days. The painter varies according to the type of paint used and the construction method, generally between three and eight days.
5. Estimated construction period of wood floor construction usually takes one week to complete the construction task of three rooms and two rooms, in which the installation of wooden keel and moisture treatment at the grassroots level for two days, the installation of the board and the floor for two days, the floor covering is planed to polish one day, the floor paint Brush for two days.
6. Estimated duration of the wooden grille ceiling The wooden grille ceiling is a relatively labor-intensive and complicated project. The wood grille ceiling is about 15 square meters. It takes about 10 days from the start of stock preparation to completion.
7. Project duration calculation of caisson ceilings Cascade ceilings are complex and technically demanding projects. The construction time is relatively long. Generally, it takes about 12 days. Woodworking takes 6 days, and electrical installation is 1 day. Brush, paste for 3 days, process waiting time 2 days
Estimated duration of the mason
1. Estimated Wall Tile Pasting Time Estimates Wall tile paste is a highly technical construction project. Each worker can complete about 5 square meters a day with good auxiliary materials and good primary treatment.
2. Estimated construction period of ground stone and porcelain brick paving The ground stone and porcelain tile paving are technically strong, and each worker paves about 6 square meters every day.
3. Estimated duration of cement mortar plastering On average, every person on the plastering roof can wipe 10 square meters, and the wall surface can wipe 14 square meters, but it requires 2 people to work together.
Estimated construction project duration
1. Estimated duration of the circuit reconstruction project The duration of the circuit reconstruction varies according to the structure. Each worker can manually slot about 20 meters per day. If it is a concrete structure, it can complete about 10 meters per person per day.
2. Estimated duration of the balcony If the balcony is closed, the time for installing the window frame and window sash is short, using steel or aluminum alloy windows, and two workers can complete the operation within one day. Convex seals have a long duration and usually take about 10 days.
3. Estimated duration of wooden keel partition wall A technical worker of wooden keel can finish about 7 square meters per day, and installing a partition wall takes about 2 days. The complexity of the wall varies and the duration will vary.
4. Estimated duration of the pipeline renovation project The reconstruction period of the pipeline shall be determined based on the complexity of the transformation and the condition of the structure. If the transformation is to be repeated across the wall and the hot and cold water is to be rebuilt and installed at the same time, the time is generally 3~ 4 days, if only in this room changes, generally 1 day time can be completed.
Paint period estimate
1. Estimated duration of mixed oil painting Mixed oil painting is a high-tech construction project. It takes a lot of man-hours. Generally, all three rooms, two halls, and all wooden furniture paintings need about 10 days, of which the grassroots treatment is about 2 days. Mixed oil brushing 3 times for 8 days, including process waiting time.
2. The estimated duration of oil painting is based on the three-bedroom, two-room home renovation example, including doors and windows, heating hoods, wooden wall skirts, and furniture making, etc., and veneering lacquer painting. The ordinary standard lacquer painting requires about 12 days. Varnish brushing takes about 14 days.
3. Estimated duration of latex paint application The technical complexity of latex paint application is low, and less man-hours are required. The top-level man-hours in construction are greater than the wall surface. Taking a three-bedroom, two-room roof and a wall surface emulsion paint as an example, it takes about six days, in which the grass-roots layer is treated for three days, the top coat is painted for two days, and the waiting time for the process is one day.
Other period estimates
1. The estimate of the wallpaper's construction period is better at the grass-roots level, with fewer wall attachments. Each person can be pasted about 20 square meters per day.
2. Estimated duration of carpet pavement If carpeting is a padded floor, two people can finish one room in a day when the grass is well treated.
3. Estimated duration of installation of kitchen equipment. A worker can work in coordination. It can install about 3 meters per day (usually the kitchen is installed with a kitchen extension of about 3 meters), including the installation of kitchen utensils, connection of water, electricity, and gas lines.
Three trees Painted living room Ceiling lacquer Lacquer paints Heating room Kitchen equipment Decorated partitions Floor tiles Doors tiled Flooring tiles Floor tiles Balcony tiles Kitchen tiles
Sanding Sponge Pad, Zirconia Sanding Sponge, Sponge Sanding Pads for Wood, Metal Sanding Sponge Pads, Automotive Sponge Sanding Pad
Foshan Nate Abrasive Science & Technology Co.,Ltd , https://www.nateabrasives.com