"Winter solstice, eat dumplings", people who have not yet been renovated can pause for a while, and gradually warm up and re-decorate them after years. However, during this time, I can't do nothing at all. "If a worker wants to do something good, he must first sharpen his tools." You can learn more about the decoration process and other knowledge before you finish the decoration. Thousands of miles began with a single step, and the tallest building rose from the ground. Today we talk about the renovation process.
First, tools in place
Before preparing for the renovation, several things must be prepared in your bag. Tape measure (buy 5m, not 3m), calculator, big plate clips (folder list, receipts); In addition, it is best to prepare old towels on the site early (the kind of soft cotton, rubbed with bricks) , plastic bag (wrapped on the pipe interface, can prevent dirt blockage)
Second, choose a good day, launch the artillery
Before the workers enter the court, it is best to measure the corners of the house in person, take them down, mark them clearly, and be sure not to be lazy. The contents of the measurement mainly include:
1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;
2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later.
Third, the main Chaigai, so space is more practical
The demolition of the main body is the first one to be put on the project. It mainly includes the demolition of walls, walls, shovels, removal of heat, replacement of steel windows, and so on. After the demolition of the completed garbage, it must be cleared up in time to ensure the cleanliness of the interior, but also to facilitate the construction.
At this point, the finished door should be set. At this time, it is best to look through cabinets, hoods, stoves, and water heaters, and you can make sure.
Fourth, hydropower reform, arrangements for the use of each space
Hydroelectric reform, no regrets medicine. Bricks on the wall, a ceiling, and then think of adding sockets can be difficult. Therefore, be sure to determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Before the hydropower reform, the cabinet designer should come to the door to make the first measurement and help you determine the power and waterway reconstruction plan.
Water heaters, it is also best to send someone to design the location of the power supply and the interface according to the model you have determined. Remind you: On the wall under the basin, it is best to leave the power outlet for the kitchen. The air-conditioning hole and power source should be placed on the wall of the bedside as much as possible to avoid air-conditioning blowing directly to people. Strong electricity and weak points must maintain a 20-centimeter gap. For example, a distance of 20 cm must be left between the outlet and the cable.
Fifth, pack up the tubes and wrap up the unsightly pipes
Considering the wet and damp environment of the kitchen and toilet, the material of the standpipe must not be wood keel! Everyone must be careful, even if the wooden keel brush anti-corrosion coating does not work. Remember to use a light steel keel, or a red brick, on the standpipe. Light steel keel provinces, but the most solid and easy to use is the red brick. At this time you need to buy a good tile, caulking agent and so on. Furniture should be set early and leave a good duration. It usually takes at least 15 days.
Sixth, tiling, the first thing with a solid texture
Before tiling, buy a Floor Drain.
Note: To buy a dedicated washing machine or shower floor drain, but also to deodorant function.
After finishing waterproofing and pulling hair, prepare a tiling.
In addition to the normal tiling, the tiles are soaked in water and dried in the shade; the tattered tiles are left for cutting, and I personally emphasize the overall beauty of the tiling. Simply put, it is the brick on the wall. The width cannot be less than 10 cm. Tiles often encounter this situation, for example, 1 meter wide wall, bricks 32 * 32cm, normal method, 3 whole 1 small. However, 32 × 3 = 96, but also to set aside 1 cm of joint space, and finally the small brick can only be posted 3cm wide. It's not my picky, narrow bricks posted there, it's hard to see how ugly it is.
As long as you make it clear to the tile master in advance, the width of the brick on the wall should not be less than 10 cm. He will cut tiles on both sides. Or just give an example of a wall that is just 1 meter wide, it becomes 2 whole 2 small. 32 × 2 = 64, set aside 1 cm of the joints, the small bricks on each side of 17.5cm on it. In this way, it seems that both sides are not only symmetrical, but neither the narrow wall nor the narrow wall will be obtrusive.
However, this practice costs money, please buy a good amount of money before buying bricks. At this time, basins and faucets should be determined, and cabinet designers should be invited to visit the house for the second time. At the same time to buy paint (mixed or clear), wall paint, lacquer, diluted water, etc., such as wallpaper, but also first set.
Renovation starts to prepare the decoration process