Deodorant drain installation steps as long as the spring does not smell
spring is coming! As the weather became warmer, the leaves slowly germinated, and the hibernating creatures were ready to breathe and smell the smell of spring. What is the smell of spring? Fresh and scented. When you feel the spring, suddenly an unpleasant smell drifts from the bathroom. The deodorant floor drain is an important "link" linking the drainage pipe system and the indoor floor. It affects the quality of indoor air. Therefore, if you do not want to be ruined by the bathroom smell of Yaxing, then start with a good deodorant drain.
Deodorant floor drain installation 1The installation height of four anti-cards through sealed odorless floor drains is ≥ 7cm (from the ground to the turn of the drain).
Deodorant floor drain installation 2
Please remove the seal core before installation to prevent debris from falling into the product.
Deodorant floor drain installation 3
If the drain pipe is too close to the ground, the drain pipe should be cut short enough so that the floor drain is slightly lower than the floor after the panel is installed (Note: Do not damage the floor waterproof layer).
Deodorant drain installation 4
If the drain pipe is too far from the ground, it can be filled with cement mortar and the drain pipe can be raised so that the floor drain can be inserted.
Deodorant floor drain installation 5
During operation, the drainage pipe is first covered with a cloth to prevent it from falling into debris, and then rolled into a cylinder matching the downpipe with kraft paper or other firm material. It is docked with the sewage pipe and rises above the ground. The mixed cement mortar (1:1) is filled into the surrounding voids. The height of the filling is after the floor drain is installed and the panel is slightly lower than the ground.
Deodorant floor drain installation 6
After the cement mortar is solidified, place the floor drain in the pipe formed by it (Note: Do not wrap the sealing core or seal the gasket against the cement mortar. This will cause the seal core to be removed or the gasket cannot be opened).
Deodorant floor drain installation 7
The gap between the floor drain panel and the ground is filled with white cement and smoothed. Finally, the sealing core is put back and covered with tweezers (Note: Use the floor drain after the cement is completely dry).
Deodorant floor drain installation 8
If it is a washing machine type floor drain, insert the drain pipe sleeve into the fixing pin on the upper part of the sealing core (it can also exclude surface water).
Deodorant floor drain installation 9
According to the use situation, usually about 20 days to clean once, clean the seal core from the floor drain body counterclockwise removed, rinse hard in the water a few times.
Whether the bathroom has any taste, are inseparable from the deodorant floor drain, Qi Jia Xiaobian learned to install the deodorant floor drain steps have learned it? I believe that the above content will have more or less understanding, I hope this article can help you. Want to know more decoration knowledge, please pay attention to this website decoration school.