Bathroom waterproof is very important bathroom construction attention to a few big details

In the decoration part, waterproofing the bathroom is to protect our daily life and prevent the toilet from leaking downstairs. It does not allow water to penetrate the building. Waterproofing is an important part of the renovation. It can be a big trouble to do, and it also affects neighbors and affects neighboring relations. Bathroom waterproofing is very important. We should pay attention to a few details in the construction of the bathroom. Today we will talk about it.

National laws stipulate that every house should be waterproof before the house is handed over, so the developers did indeed waterproof each room. But why do we need to do waterproofing in the renovation? Because the waterproofing done by developers is really water! It's not waterproof. It can only be considered as a perfunctory task. The water in the bathroom of the clean water room just got it can be said to be one of the waste, and it is not waterproof at all. Everyone can think about how much money developers are willing to spend to provide exquisite waterproofing for every type of bathroom in all properties in order to save their own capital. The big deal is to do whatever they like and check it out!

The significance of bathroom waterproofing

After understanding the waterproofing that the developer has done for the house, you must have some bottom in mind. To do waterproofing to the bathroom during the renovation is really to ensure our daily life, not to let the bathroom leak downstairs, but also does not allow water to penetrate into the building, so it is necessary to do a toilet for the sake of neighboring relations and floor safety. Waterproof project!

Bathroom construction attention to several details

There are many kinds of materials used for bathroom waterproofing at present, basically the waterproof effect is good. But you should pay attention to the specific construction details.

1, the bathroom floor to do leveling. If you want to change the floor tiles of the bathroom, you must first level the floor with cement mortar after the original floor tiles are cut, and then do the waterproof treatment. This will prevent leakage of the waterproof coating due to uneven thickness.

2, seams to brush in place. The seams between the bathroom wall and the seams between the upper and lower water pipes and the ground are the most prone to problems. During construction, you must urge the workers to handle these corners. All waterproof paint must be applied in place.

3, wall treatment is also very important. In the general bathroom waterproofing treatment, a waterproof coating of about 30 cm in height is also required on the wall to prevent water accumulation from passing through the wall. However, if the wall of the bathroom is a non-load-bearing light wall, the entire wall should be covered with a waterproof coating. If your home uses a two-seater shower screen, the two walls that are associated with it must be fully painted. If your home uses a bathtub, the height of the waterproof coating should be higher than the upper edge of the bathtub.

4, waterproof experiment must do. After the construction of the bathroom was completed, all the water in the bathroom was blocked, and a 25 cm high “can” was built at the entrance. Then, 20 cm of water was poured into the bathroom. After 24 hours, you can check whether there is any leakage around the wall and the ground. This 24-hour waterproof test is the key to ensuring the quality of the bathroom waterproofing project. You must do it.

5, keep the water open. All sewers in the bathroom, including floor drains, sanitary ware plumbing, etc., should be kept open. In this way, we can fundamentally avoid the occurrence of the "flooded seven army" tragedy.

Editors remind: In the general bathroom waterproofing, the wall is also about 30 cm high waterproof coating to prevent stagnant water through the wall. However, if the wall of the bathroom is a non-load-bearing light wall, the entire wall should be covered with a waterproof coating. This will prevent leakage of the waterproof coating due to uneven thickness or penetration of the waterproof membrane. In order to achieve a better waterproof effect, the general bathroom wall should also be about 30cm high waterproof treatment to prevent stagnant water through the wall. After 24 hours inspection, if there is no leakage around the bathroom wall and the ground, the waterproof quality of the bathroom is very good.

Hydroelectric reform bathtub coating cement bathroom waterproof bathroom floor tile bathroom door

Spherical Roller Bearings

Spherical roller bearings have two rows of rollers that are mainly subjected to radial loads, but also axial loads in either direction. It has a high radial load capacity, which is especially suitable for working under heavy loads or vibration loads, but cannot withstand pure axial loads. The raceway of the outer ring of this type of bearing is spherical, so its self-alignment performance is good, and it can compensate for the coaxiality error.
There are two rows of symmetrical spherical rollers, the outer ring has a common spherical raceway, the inner ring has two raceways inclined to an angle with the bearing axis, has good self-alignment performance, when the shaft is bent or installed differently when the bearing can still be used normally, the self-alignment varies with the bearing size series, the general allowable self-alignment angle is 1~2.5 degrees, the load capacity of this type of bearing is larger, in addition to being able to bear the radial load, the bearing can also bear the axial load of two-way action, and has good impact resistance, In general, spherical roller bearings are allowed to operate at a lower operating speed.
17042646627821

Spherical Roller Bearings,Precision Ball Bearings,High Temperature Bearings,Spherical Roller Thrust Bearing

Hebei Fangqiang bearing manufacturing Co., LTD , https://www.fangqiangbearing.com