Universal grinder operating procedures
2023-05-07 10:10:41
The operation rules of the universal grinder are as follows: 1. Preparation before operation: 1 Check whether the components are installed firmly, especially the fixing nut of the movable tooth, and tighten the screw; 2 check the cleaning status of the equipment; 3 check the lubrication of the equipment; 4 Check whether the upper and lower pulleys are parallel in the same plane and the belt is tight; 5 There should be no jamming when turning by hand, and the spindle runs freely; 6 The pulverized material is pre-cut into segments, sheets or blocks as necessary to avoid blocking the steel teeth and increase the motor load; 7 Check the materials, pay attention to remove metal foreign objects such as nails in the materials to prevent accidents. run: 1 Open the collection box door, put a special cloth bag on the discharge opening, and close the collection door; 2 Select the screen according to the product process requirements and install the screen; 3 Check whether the material to be crushed needs to be pretreated; 4 first open the fan switch, then open the motor switch to make the equipment run normally, add materials, adjust the feeding speed according to the fragility of the material and the fineness of the crushing; 5 Before the end of the crushing operation or before stopping, the feeding should be stopped first, and the machine should continue to run for several minutes, and there is no residue in the room to be crushed; 6 Discharge: Turn off the motor switch, open the collection box door, and take out the materials for use; 7 If the amount of pulverized material is large, it can be repeated until the material is completely pulverized; 8 After the operation is finished, turn off all power switches; 9 Check the equipment for abnormalities and the equipment components are in good condition. Universal crusher operation method: 1. Rotate the handwheel. When it is loose to a certain extent, gently push the handwheel to the left to open the smashing door cover. 2. Loosen the fixing screw of the crushing chamber, remove the ring gear, take out the sieve, replace it with a suitable sieve, and attach the ring gear. 3. Close the smashing chamber door cover and tighten the smashing chamber fixing screws. 4. Open the discharge door cover, connect the receiving bag to the discharge hopper, and then tie the bag. 5, close the discharge door cover 6. Turn on the power switch. After turning on, perform the no-load test for 1-2 minutes, then adjust the material flow. General shredder use precautions: 1. Check if there is any foreign matter in the crushing chamber (it must be empty before starting) and turn on the power. 2. Tighten the upper cap and the butterfly nut of the crushing chamber. 3. Start the motor, rotate the machine for 1-2 minutes, then gradually feed the material from the feeding tray. The feeding should not be too fast. 4. If the material is stuck and the motor does not turn, please turn it off immediately to avoid the motor burning. After the card material is cleared, you can continue to use it. 5. It is strictly forbidden to open the upper cover and reach into the crushing chamber by hand during the use. 6. This machine is a dry pulverizer. It is not advisable to smash wet objects and sticky objects. 7. Please change the screen according to your needs. Universal crusher maintenance: 1. Regularly check whether the fixing nut of the movable toothed disc is loose and all the fastening parts must not be loose. In particular, check the screws in the fixed sprocket. 2. Lubrication: Wherever the oil cup is installed, the appropriate lubricating oil should be injected before starting the machine. For continuous work, the number of refueling should be increased appropriately. The actual working hours are over 300 hours, and the new lubricating oil must be replaced after cleaning the spindle bearing cavity. 3. When replacing consumable parts and rolling bearings, pay attention to the use of the technical screw holes. The operation is performed by the repairman familiar with the machine. If the user's operation is difficult, please contact the factory in time, do not arbitrarily dismantle. Author: Chang Hong medicine machine This article links: Copyright @Reprinted must indicate the author and original source in the form of a link |
Laser Stage Light,Dmx Laser,Mini Laser Lighting,Led Laser Moving Head
Big Dipper Laser Science And Technology Co., Ltd , https://www.bigdipper-laser.com