Steel drum cleaning process and equipment structure

crafting process
Pre-degreasing
Degreasing
First wash
Second washing
Phosphating
Third wash
Operating temperature
50°C±5°C
50°C±5°C
Normal temperature
Normal temperature
50°C±5°C
Normal temperature
Processing time (minutes)
1
2
1
1
2
1
Processing section length (m)
1.2
2.4
1.2
1.2
2.4
1.2
Casing made of 4mm thick carbon steel plate
long
1,000
2000
1,000
1,000
2000
1,000
width
1450
1450
1450
1450
1450
1450
high
980
980
980
980
980
980
Filled glass steel
2.5mm
2.5
1.5
1.5
3.0
1.5
With water pump
65SG30-27
65SG30-50
65SG30-27
65SG30-27
65SP30-50
65SG30-27
Electricity consumption kw
4
7.5
4
4
7.5
4
Infusion tube material
Carbon steel
Carbon steel
Carbon steel
Carbon steel
stainless steel
Carbon steel
Nozzle material
stainless steel
stainless steel
stainless steel
stainless steel
stainless steel
stainless steel
Steam mode
Steam coil
Steam coil
Steam coil
control method
switch
switch
switch
Note: 1. The drum cleaning operation is carried out in an enclosed energy channel, and the channel is made of 4mm thick plastic plate.
2, cleaning methods: take a horizontal spray. During the spraying, the steel drum rotates while rotating, so that the cylindrical surface of the steel drum (finished product barrel) and the barrel bottom lid are sprayed on three sides. Since the barrel rotates, the appearance of the steel barrel is completely cleaned. When the semi-manufactured product is to be cleaned, the liquid sprayed from the nozzles of the bottom cover of the spray tub is sprayed into the interior of the pail so that the inside and outside surfaces of the pail frame are cleaned. Barrel bottom cover cleaning is inserted in the transmission chain for cleaning.
3, the transmission chain is about 20 meters long, about 19 meters of rails, all made of stainless steel. Transmission speed is continuously adjustable from 0.4 to 2.5m/min.
4, the processing volume of finished barrels per minute, half, half a barrel per minute.