Introduction and use technology of pellet feed processing equipment
In order to make the pellet feed processing equipment operate normally, prolong its service life and reduce failures, and improve economic efficiency, it is required to proceed as follows.
1 Equipment installation and commissioning
1.1 Before installation, check whether the basic dimensions of each installation meet the requirements of the drawings according to the equipment plan and foundation map. If there are any discrepancies, they should be repaired until the dimensions are correct before installation.
1.2 The installer should be familiar with the installation requirements of each equipment and strictly follow the technical requirements.
1.3 The equipment may cause deformation, damage or loss during transportation. Therefore, before installation, check and check the equipment list, and take corresponding measures to ensure that the equipment is in good condition before installation.
1.4 Before each equipment enters the installation site, it shall be numbered, and the installation process flow card and schedule shall be formulated. According to the requirements of the installation process sequence, the equipment shall be transferred to the site for installation.
1.5 Installation sequence: From top to bottom, install the connecting pipes and electrical equipment after the host equipment and the rack are in place.
1.6 Tools required for installation: Equipment and materials must be available.
1.7 After the installation, the rotating parts of the equipment must be flexible and free from card, bump and impact. The connecting parts must be firm and sealed, and there must be no leakage, leakage or oil leakage.
1.8 The installation of electrical equipment shall comply with the relevant national regulations. The direction of each line shall be clear, and there shall be no running or leakage of electricity. Wires and cables shall have protective casings to prevent rat bites.
1.9 After all the equipments have been installed, each single unit should be tested for empty vehicles, and the normal operation can be put into the load test.
1.10 Before the load test, the electronic batching scale and the packing scale are calibrated to achieve the specified accuracy.
1.11 The load is running for 8h, and it can be delivered to the factory for production without any trouble.
2 Operation and use of
2.1 Check the equipment by the staff on duty before driving.
2.1.1 Whether there is any foreign matter falling into the equipment; whether the rotating parts are flexible, whether there is any card or collision phenomenon; whether the connecting parts are firm; whether there are leakage powder, air leakage, oil leakage, etc. If there is a fault, it should be eliminated in time.
Material characteristic: Using high quality aluminum extruded shutter profiles, multi-layer painting or film layer surface have excellent scratch resistance function, not decay, wearable and anti-collision.Nice white profiles, accepting mass customization according to users requirements(light gray, brown, cream, wood, fused, sand color and light sand color ,etc.)
Integrated protection and decorative features together,the best replacement of traditional theft network security replacement; flexible way open ways, supporting hand control, group control. The door could be your safe rescue channel when in emergency.
When in state of close, support ventilation and lighting, this contribute to enhance the cooling and heating effect of air conditioner, ensure safety, comfortable, energy saving, noise isolation and aesthetics.
Aluminum Roller Shutter Door,Commercial Aluminum Roller Shutter Door,Aluminum Alloy Roller Shutter Door,Color Steel Aluminum Roller Shutter Door
Shenzhen Hongfa Automatic Door Co., Ltd. , https://www.hfrollershutterdoor.com