How to check the sewage tank cover after installation?

The scope of use of FRP sump cover plate With the rapid decline of petrochemical, chemical fertilizer, industrial wastewater, medicine, aquaculture, municipal sewage treatment and other industries, many odorous gases are rapidly added and significantly affected. The surrounding environment and the quality of life of people, and their physical weakness.
In order to deal with this situation, the manufacturer has developed and consumed the defoaming solution of the FRP sump cover with the experience of many years of consumption design, combined with its actual situation, and shrouded the hood over the tank body and sealed the exhaust gas. The deodorizing installation is matched with pipelines, fans, pollution towers, etc., to achieve the purpose of improving air quality and maintaining the environment.
A FRP cover plate is added above the cover of the sewage pool. At this time, the exhaust gas generated in the sewage pool is cut off from the air, an air outlet is added to the outer surface of the gas collecting cover, and a ventilation pipe is installed, and the exhaust gas enters the exhaust gas pollution tower through the ventilation pipe, so as to increase the exhaust gas. Collecting, installing a FRP fan in front of the pollution tower, the exhaust gas is sucked into the pollution tower by the fan, and the exhaust gas is sprayed in two stages in the tower. If the exhaust gas is acidic, it is absorbed by the alkali liquid circulation. If the exhaust gas is alkaline, the acid liquid is sprayed. Absorption, exhaust gas solution efficiency of more than 90%, emissions have reached national standards.
Before the construction of the FRP effluent hood, the FRP effluent cover is inspected before the construction, and the inspection personnel need to carry out quality inspection and reflection to ensure the safety and applicability of the data. So what are the procedures for acceptance and reflection before the construction of the FRP sink cover? The above small series will introduce you as follows:
1. Before the construction process is inspected, the quality personnel should provide all the irrelevant quality records of the previous process (required that the visa has been approved), and require the process quality assessment form to be filled in after each process acceptance.
2. In the project quality control, the quality of the project is the quality of the work in each project area; the work area is equipped with full-time quality staff to manage the daily quality inspection work; each construction team is set up as a part-time quality staff, doing self-inspection and mutual inspection work. .
3. The experimenter takes the experimental work of the whole project, introspects and supervises the sampling, analysis and experiment work of various purchase materials, helps the data department to do a good job of introspecting various purchase materials, and puts the quality of the purchase materials into the market. Off, sample inspection and inspection of unrelated technical targets, carry out the manufacture, maintenance, inspection and strength assessment of the test block, and serve as the collection and rectification of the documents, tests and experimental reports of the purchase materials.
4. The data officer accepts and inspects the quality of the purchase information. For the purchase of materials, the quality assurance book provided by the supplier must be provided. The technical parameters and experimental reports of the construction effluent cover are irrelevant. All kinds of materials enter the site. The testers should carry out the test according to the standard requirements and do a random inspection. And the inspection work, no warranty or unqualified inspection materials are strictly prohibited to apply, extraordinary data should be sampled before the purchase, the qualified front can be applied to the field.
This article URL: http://

China Hardware Business Network Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

Electric Chain Hoist

Cm Lodestar,Electric Hoist 1 Ton,1 Ton Electric Chain Hoist,2 Ton Electric Chain Hoist

Guangdong Gongyou Lift Slings Machinery CO.,LTD , https://www.workmateslift.com