Blank room inspection program
There are only doors and frames in the house with no doors, and the room where the wall surface is only treated as a foundation and not surface treated is called the “growth room.†Although the rough house has passed the acceptance inspection of the relevant department, the buyers are turning the rough house into self-identity. Before space, you need to understand the acceptance criteria of the rough house. According to the usual standards, when the house is delivered, the rough house needs acceptance in the following areas:
>>>House inspection procedures for housekeeping and inspection
(1) All exterior finishes, exterior facades, exterior wall tiles and coatings, unit doors, and corridors.
(2) The common parts, public facilities, various pipelines (supplies, platoons, rainwater, warmth, heat), electrical equipment (distribution boxes, cabinets, plates, sockets, switches, lamps, etc.) shall be completed in accordance with the design documents. Renovation, and complete various test items as required.
(3) Various pipelines should also be inspected for water passing, pressure test, pass ball test and commissioning of heating and thermal engineering.
(4) Check the wall and top layer for no traces of leakage.
(5) Where prefabricated floor slabs or cast-in-place roofs are used in each room within the door, it shall be done without plaster and leveled with putty, so that there shall be no cracks in the slab joints, and there shall be smooth and smooth surfaces without any mistakes. The surface shall be smooth and the colour shall be substantially uniform. Straight line standards. The concrete on the ground floor of each room within the door should be flat, compacted, firmly bonded, and free of cracks.
(6) Floors with waterproof requirements should be planned in strict accordance with the construction requirements of the waterproof layer and the protective layer. During the acceptance, a 24-hour storage test should be conducted to ensure that no leakage occurs.
(7) The floor drain and the flooding slope are in line with the design requirements, and the pan-water shall not be poured. The joint shall be smooth and smooth without leakage.
(8) The elevation of the concrete ground floor in various rooms should be considered for the height dimensions required for re-decoration.
House inspection entrance decoration restaurant decoration room decoration design switch socket heating exterior wall tile ld tile
Middle Range Laser Rangefinder including finishied laser rangefinders and laser range modules. It's a professional laser measuring tool that support serial transport, such as bluetooth, TTL, arduino, Rasperry Pi etc. Also, the finished laser rangefinders are excellent device for golf and hunting. High precision, fast response, low power consumption, get your rangefinders to make every measurement easy!
With 14 years manufacturing experience in laser measure solution, we support OEM/ODM service. Welcome to consult with our experts.
Mid Range Laser Rangefinder Module,Range Finder Sensor,Digital Laser Range Finder Distance Meter,Laser Measure Module
Chengdu ZT Electronics Technology Co., Ltd. , https://www.lasermeasuretool.com